UI v2 Rewire (Canonical Planning Set)

This directory contains two things:

  • Raw iterative design packs (pack-01.md ... pack-22.md)
  • Cleansed planning inputs for sprint decomposition

Use these files as the planning entrypoint:

  • source-of-truth.md - canonical IA decisions and normalized terminology
  • authority-matrix.md - pack precedence, supersession, and explicit overrides
  • sprint-planning-guide.md - how to split this redesign into many implementation sprints
  • multi-sprint-plan.md - first full many-sprint decomposition (Draft 1)

S00 package files:

  • S00_sprint_spec_package.md - detailed S00 sprint spec with acceptance criteria
  • S00_contract_ledger_template.md - reusable endpoint contract ledger template
  • S00_endpoint_contract_ledger_v1.md - starter ledger sheet for immediate use
  • S00_endpoint_contract_ledger_v2_pack22.md - Pack 22 contract delta and backend dependency baseline

Precedence policy

This planning set uses a strict rule: for overlapping decisions, higher pack number wins.

A higher pack that does not define a screen in detail does not erase the latest lower-pack detail for that screen.

Raw materials

Raw packs are preserved as historical input and should not be used directly as the source of truth for sprint planning:

  • pack-01.md ... pack-22.md
  • prompt.txt

Planning rule

When a sprint references a UI redesign requirement, it must cite:

  1. The canonical file (source-of-truth.md and/or authority-matrix.md), and
  2. The authoritative pack section listed there.