Some checks failed
Docs CI / lint-and-preview (push) Has been cancelled
- Implemented EmailChannelTestProvider to generate email preview payloads. - Implemented SlackChannelTestProvider to create Slack message previews. - Implemented TeamsChannelTestProvider for generating Teams Adaptive Card previews. - Implemented WebhookChannelTestProvider to create webhook payloads. - Added INotifyChannelTestProvider interface for channel-specific preview generation. - Created ChannelTestPreviewContracts for request and response models. - Developed NotifyChannelTestService to handle test send requests and generate previews. - Added rate limit policies for test sends and delivery history. - Implemented unit tests for service registration and binding. - Updated project files to include necessary dependencies and configurations.
2.7 KiB
2.7 KiB
Authority Plug-in Scoped Service Coordination
Created: 2025-10-19 — Plugin Platform Guild & Authority Core
Status: Scheduled (session confirmed for 2025-10-20 15:00–16:00 UTC)
This document tracks preparation, agenda, and outcomes for the scoped-service workshop required before implementing PLUGIN-DI-08-002.
Objectives
- Inventory Authority plug-in surfaces that need scoped service lifetimes.
- Confirm session/scope handling for identity-provider registrars and background jobs.
- Assign follow-up tasks/actions with owners and due dates.
Scheduling Snapshot
- Meeting time: 2025-10-20 15:00–16:00 UTC (10:00–11:00 CDT / 08:00–09:00 PDT).
- Facilitator: Plugin Platform Guild — Alicia Rivera.
- Attendees (confirmed): Authority Core — Jasmin Patel; Authority Security Guild — Mohan Singh; Plugin Platform — Alicia Rivera, Leah Chen.
- Optional invitees: DevOps liaison — Sofia Ortega (accepted).
- Logistics: Invites sent via shared calendar on 2025-10-19 15:30 UTC with Teams bridge + offline dial-in. Meeting notes will be captured here.
- Preparation deadline: 2025-10-20 12:00 UTC — complete checklist below.
Pre-work Checklist
- Review
ServiceBindingAttributecontract introduced by PLUGIN-DI-08-001. - Collect existing Authority plug-in registration code paths to evaluate.
- Audit background jobs that assume singleton lifetimes.
- Identify plug-in health checks/telemetry surfaces impacted by scoped lifetimes.
Pre-work References
- Add links, file paths, or notes here prior to the session.
Draft Agenda
- Context recap (5 min) — why scoped DI is needed; summary of PLUGIN-DI-08-001 changes.
- Authority plug-in surfaces (15 min) — registrars, background services, telemetry.
- Session handling strategy (10 min) — scope creation semantics, cancellation propagation.
- Action items & owners (10 min) — capture code/docs/test tasks with due dates.
- Risks & follow-ups (5 min) — dependencies, rollout sequencing.
Notes
- Pending coordination session; populate afterwards.
Action Item Log
| Item | Owner | Due | Status | Notes |
|---|---|---|---|---|
| Confirm meeting time | Alicia Rivera | 2025-10-19 15:30 UTC | DONE | Calendar invite sent; all required attendees accepted |
| Compile Authority plug-in DI entry points | Jasmin Patel | 2025-10-20 | IN PROGRESS | Gather current Authority plug-in registrars, background jobs, and helper factories that assume singleton lifetimes; add the list with file paths to Pre-work References in this document before 2025-10-20 12:00 UTC. |
| Outline scoped-session pattern for background jobs | Leah Chen | Post-session | BLOCKED | Requires meeting outcomes |