# UI v2 Rewire (Canonical Planning Set)
|
|
|
|
This directory contains two things:
|
|
- Raw iterative design packs (`pack-01.md` ... `pack-22.md`)
|
|
- Cleansed planning inputs for sprint decomposition
|
|
|
|
Use these files as the planning entrypoint:
|
|
- `source-of-truth.md` - canonical IA decisions and normalized terminology
|
|
- `authority-matrix.md` - pack precedence, supersession, and explicit overrides
|
|
- `sprint-planning-guide.md` - how to split this redesign into many implementation sprints
|
|
- `multi-sprint-plan.md` - first full many-sprint decomposition (Draft 1)
|
|
|
|
S00 package files:
|
|
- `S00_sprint_spec_package.md` - detailed S00 sprint spec with acceptance criteria
|
|
- `S00_contract_ledger_template.md` - reusable endpoint contract ledger template
|
|
- `S00_endpoint_contract_ledger_v1.md` - starter ledger sheet for immediate use
|
|
- `S00_endpoint_contract_ledger_v2_pack22.md` - Pack 22 contract delta and backend dependency baseline
|
|
|
|
## Precedence policy
|
|
|
|
This planning set uses a strict rule: for overlapping decisions, **higher pack number wins**.
|
|
|
|
A higher pack that does not define a screen in detail does not erase the latest lower-pack detail for that screen.
|
|
|
|
## Raw materials
|
|
|
|
Raw packs are preserved as historical input and should not be used directly as the source of truth for sprint planning:
|
|
- `pack-01.md` ... `pack-22.md`
|
|
- `prompt.txt`
|
|
|
|
## Planning rule
|
|
|
|
When a sprint references a UI redesign requirement, it must cite:
|
|
1. The canonical file (`source-of-truth.md` and/or `authority-matrix.md`), and
|
|
2. The authoritative pack section listed there.
|