Plugin Determinism Harness (Stub)
Tracks PL1–PL10 gaps from 31-Nov-2025 FINDINGS.md.
- TODO: Capability catalog fixture with DSSE signatures.
- TODO: Resource limit tests (CPU/mem/time) with deterministic seeds.
- TODO: Offline plugin index verification and revocation path.
- TODO: Crash kill-switch simulation fixtures.