# Enable Reachability — Draft Skeleton (2025-12-05 UTC) Status: draft placeholder. Inputs pending: DOCS-SIG-26-007, notifications hooks (058_NOTY0101), rollout telemetry contract. ## Purpose - Describe why reachability is being enabled and expected outcomes. ## Rollout Phases - Phase 0: prerequisites (feature flags, config keys). - Phase 1: limited tenants / canaries. - Phase 2: org-wide rollout with monitoring gates. ## Fallbacks - How to disable/revert; config toggles; cache/queue drains. ## Monitoring & Alerts - Metrics to watch (ingest lag, signal volume, error ratios). - Alert thresholds and runbooks (link when available). ## Controls & Policy - Imposed rule reminder; RBAC/tenant scope considerations. ## Open TODOs - Fill concrete config keys and examples when DOCS-SIG-26-007 lands. - Add notification hook wiring details from 058_NOTY0101.