# SPRINT_4400 SUMMARY: Delta Verdicts & Reachability Attestations ## Program Overview | Field | Value | |-------|-------| | **Program ID** | 4400 | | **Theme** | Attestable Change Control: Delta Verdicts & Reachability Proofs | | **Priority** | P2 (Medium) | | **Total Effort** | ~4 weeks | | **Advisory Source** | 19-Dec-2025 - Stella Ops candidate features mapped to moat strength | --- ## Strategic Context This program extends the attestation infrastructure to cover: 1. **Smart-Diff semantic delta** — Changes in exploitable surface as signed artifacts 2. **Reachability proofs** — Call-path subgraphs as portable evidence --- ## Sprint Breakdown | Sprint ID | Title | Effort | Moat | |-----------|-------|--------|------| | 4400_0001_0001 | Signed Delta Verdict Attestation | 2 weeks | 4 | | 4400_0001_0002 | Reachability Subgraph Attestation | 2 weeks | 4 | --- ## Dependencies - **Requires**: SPRINT_4300_0001_0001 (OCI Verdict Push) - **Requires**: MaterialRiskChangeDetector (exists) - **Requires**: PathWitnessBuilder (exists) --- ## Outcomes 1. Delta verdicts become attestable change-control artifacts 2. Reachability analysis produces portable proof subgraphs 3. Both can be pushed to OCI registries as referrers --- **Sprint Series Status:** TODO **Created:** 2025-12-22