# S00 Contract Ledger Template
|
||||
|
||||
Status: Template
|
||||
Purpose: classify backend readiness for each UI screen in v2 rewire
|
||||
|
||||
## Classification values
|
||||
|
||||
Use exactly one status value per row:
|
||||
- `EXISTS_COMPAT`: endpoint exists and contract already matches target behavior.
|
||||
- `EXISTS_ADAPT`: endpoint exists but requires request/response/schema/semantic adaptation.
|
||||
- `MISSING_NEW`: no suitable endpoint exists; new contract required.
|
||||
|
||||
## Required columns
|
||||
|
||||
| Domain | Screen/Page | Canonical source refs | Current route/page | Current endpoint candidate(s) | Status | Owner module | Auth scope impact | Schema delta summary | Decision/risk notes | Action ticket |
|
||||
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|
||||
| `<Dashboard/Release Control/etc>` | `<screen>` | `<source-of-truth section + authority-matrix row + pack section>` | `<current path>` | `<service + path>` | `<EXISTS_COMPAT/EXISTS_ADAPT/MISSING_NEW>` | `<src module>` | `<none/new/changed>` | `<1-2 lines>` | `<risk + mitigation>` | `<ticket id>` |
|
||||
|
||||
## Validation checklist
|
||||
|
||||
- [ ] Every active-authority screen from `authority-matrix.md` has a row.
|
||||
- [ ] No row has empty `Status`.
|
||||
- [ ] Every `MISSING_NEW` row includes a concrete proposed endpoint in notes.
|
||||
- [ ] Every `EXISTS_ADAPT` row identifies schema or semantic delta.
|
||||
- [ ] Every row lists owner module and auth scope impact.
|
||||
|
||||
## Owner module reference set
|
||||
|
||||
Use these module names consistently:
|
||||
- `ReleaseOrchestrator`
|
||||
- `Policy`
|
||||
- `EvidenceLocker`
|
||||
- `Attestor`
|
||||
- `Signer`
|
||||
- `Integrations`
|
||||
- `Scanner`
|
||||
- `Orchestrator`
|
||||
- `Scheduler`
|
||||
- `Authority`
|
||||
- `Web`
|
||||
|
||||
## Optional extension columns
|
||||
|
||||
Add only if needed:
|
||||
- `Data freshness contract`
|
||||
- `Determinism/offline constraints`
|
||||
- `Telemetry events`
|
||||
- `Deprecation/redirect dependency`
|
||||
166
docs/modules/ui/v2-rewire/S00_sprint_spec_package.md
Normal file
166
docs/modules/ui/v2-rewire/S00_sprint_spec_package.md
Normal file
@@ -0,0 +1,166 @@
|
||||
# S00 Sprint Spec Package - v2 Rewire Spec Freeze
|
||||
|
||||
Status: Draft for transfer into `docs/implplan`
|
||||
Date: 2026-02-18
|
||||
Working directory: `docs/modules/ui/v2-rewire`
|
||||
Canonical source: `source-of-truth.md`, `authority-matrix.md`, `multi-sprint-plan.md`
|
||||
|
||||
## Sprint identity seed
|
||||
|
||||
Recommended target filename when write scope includes `docs/implplan`:
|
||||
- `SPRINT_20260218_001_DOCS_ui_v2_rewire_spec_freeze.md`
|
||||
|
||||
## Topic and scope
|
||||
|
||||
- Freeze unresolved IA and ownership decisions so implementation sprints do not fork behavior.
|
||||
- Produce authoritative specs for unresolved `Advisory Sources`, nav rendering policy, trust ownership transition, and route deprecation baseline.
|
||||
- Establish a first complete endpoint contract ledger covering all root domains.
|
||||
- Working directory: `docs/modules/ui/v2-rewire` (planning docs only).
|
||||
- Expected evidence: signed decision records, canonical mapping tables, completed contract ledger v1.
|
||||
|
||||
## Dependencies and concurrency
|
||||
|
||||
- Upstream: none.
|
||||
- Downstream blocked by incomplete S00 decisions: S01, S02, S03.
|
||||
- Safe parallelism inside S00:
|
||||
- T01 and T02 can run in parallel.
|
||||
- T03 depends on T01 and T02 outputs.
|
||||
- T04 can run in parallel with T01/T02.
|
||||
- T05 starts after T01-T04 freeze points are approved.
|
||||
|
||||
## Documentation prerequisites
|
||||
|
||||
Must be read before any task enters DOING:
|
||||
- `docs/modules/ui/v2-rewire/source-of-truth.md`
|
||||
- `docs/modules/ui/v2-rewire/authority-matrix.md`
|
||||
- `docs/modules/ui/v2-rewire/sprint-planning-guide.md`
|
||||
- `docs/modules/ui/v2-rewire/multi-sprint-plan.md`
|
||||
- `docs/modules/ui/v2-rewire/pack-19.md`
|
||||
- `docs/modules/ui/v2-rewire/pack-20.md`
|
||||
- `docs/modules/ui/v2-rewire/pack-21.md`
|
||||
|
||||
## Delivery tracker
|
||||
|
||||
### S00-T01 - Security and Risk Advisory Sources final spec
|
||||
Status: TODO
|
||||
Dependency: none
|
||||
Owners: Product Manager, Documentation Author
|
||||
Task description:
|
||||
- Define full screen-level specification for `Security and Risk -> Advisory Sources`, including navigation entry, filters, primary data objects, decision impact fields, and drilldown links to Integrations and Platform Ops.
|
||||
- Resolve the split contract between advisory connectivity/freshness ownership and release-gating interpretation ownership.
|
||||
- Produce concrete UI behavior for stale, unavailable, and conflicting advisory-source states.
|
||||
|
||||
Completion criteria:
|
||||
- [ ] Canonical screen definition exists with sections: purpose, layout, primary actions, empty/error states, and deep links.
|
||||
- [ ] Ownership boundary is explicit for each field on the screen (`Security and Risk`, `Integrations`, `Platform Ops`).
|
||||
- [ ] Required backend contract list exists for this screen with preliminary status (`EXISTS_COMPAT` / `EXISTS_ADAPT` / `MISSING_NEW`).
|
||||
- [ ] Source references cite canonical files and authoritative pack sections.
|
||||
|
||||
### S00-T02 - Release Control capability rendering policy
|
||||
Status: TODO
|
||||
Dependency: none
|
||||
Owners: Project Manager, UX Lead
|
||||
Task description:
|
||||
- Freeze navigation rendering rule for Release Control-owned capabilities (`Releases`, `Approvals`, `Deployments`, `Regions and Environments`, `Bundles`):
|
||||
- either direct root shortcuts + domain ownership,
|
||||
- or strictly nested navigation under `Release Control`.
|
||||
- Define one allowed rendering pattern for desktop and mobile nav.
|
||||
|
||||
Completion criteria:
|
||||
- [ ] One rendering policy selected and documented, including rationale and migration impact.
|
||||
- [ ] Breadcrumb and route naming convention for selected policy is documented.
|
||||
- [ ] Policy includes explicit do/do-not guidance to prevent mixed rendering in downstream sprints.
|
||||
- [ ] Policy references route migration obligations captured in S00-T04.
|
||||
|
||||
### S00-T03 - Trust and signing ownership transition policy
|
||||
Status: TODO
|
||||
Dependency: S00-T01, S00-T02
|
||||
Owners: Product Manager, Security Architect, Documentation Author
|
||||
Task description:
|
||||
- Finalize ownership transition where `Administration` owns `Trust and Signing` while `Evidence and Audit` and `Security and Risk` consume trust state.
|
||||
- Define canonical link model, breadcrumbs, and allowed alias behavior during migration.
|
||||
|
||||
Completion criteria:
|
||||
- [ ] Ownership statement is explicit and unambiguous.
|
||||
- [ ] Allowed cross-links from `Evidence and Audit` and `Security and Risk` are defined by page.
|
||||
- [ ] Legacy route behavior is specified (`redirect`, `alias`, or `deprecated`) with timelines.
|
||||
- [ ] Auth scope impact and role expectations are documented.
|
||||
|
||||
### S00-T04 - Route deprecation baseline map
|
||||
Status: TODO
|
||||
Dependency: none
|
||||
Owners: Project Manager, Frontend Lead
|
||||
Task description:
|
||||
- Build baseline route map from current routing to target IA naming and ownership.
|
||||
- Include historical aliases and required compatibility redirects.
|
||||
|
||||
Completion criteria:
|
||||
- [ ] Route map covers all root domains and major child routes.
|
||||
- [ ] Every legacy route has exactly one mapped target action (`keep`, `redirect`, `alias`, `remove-later`).
|
||||
- [ ] Risk list exists for high-churn routes and deep links.
|
||||
- [ ] Deprecation map references the selected nav rendering policy from S00-T02.
|
||||
|
||||
### S00-T05 - Endpoint contract ledger bootstrap (v1)
|
||||
Status: TODO
|
||||
Dependency: S00-T01, S00-T02, S00-T03, S00-T04
|
||||
Owners: Project Manager, API Architect, Module Leads
|
||||
Task description:
|
||||
- Produce contract ledger v1 across all root domains using the canonical template in `S00_contract_ledger_template.md`.
|
||||
- Classify each screen/API dependency as `EXISTS_COMPAT`, `EXISTS_ADAPT`, or `MISSING_NEW`.
|
||||
|
||||
Completion criteria:
|
||||
- [ ] Ledger includes every root domain and all screens identified as active authority in `authority-matrix.md`.
|
||||
- [ ] Every row includes owner module, auth scope impact, and schema delta notes.
|
||||
- [ ] `MISSING_NEW` rows include explicit proposed endpoint and schema action item.
|
||||
- [ ] Ledger reviewed by frontend and backend owners.
|
||||
|
||||
### S00-T06 - S00 sign-off and handoff packet
|
||||
Status: TODO
|
||||
Dependency: S00-T01, S00-T02, S00-T03, S00-T04, S00-T05
|
||||
Owners: Project Manager
|
||||
Task description:
|
||||
- Compile decision outputs and publish an implementation-ready handoff packet for S01-S03.
|
||||
|
||||
Completion criteria:
|
||||
- [ ] Final S00 summary includes frozen decisions, unresolved risks, and downstream constraints.
|
||||
- [ ] Handoff packet links all approved artifacts and identifies owners for S01, S02, S03.
|
||||
- [ ] All S00 tasks are either DONE or explicitly BLOCKED with mitigation.
|
||||
|
||||
## Acceptance gate (sprint-level)
|
||||
|
||||
S00 is considered DONE only if all checks pass:
|
||||
- [ ] Advisory Sources final spec completed and approved.
|
||||
- [ ] Release Control rendering policy frozen and approved.
|
||||
- [ ] Trust ownership transition policy frozen and approved.
|
||||
- [ ] Route deprecation baseline map completed.
|
||||
- [ ] Endpoint contract ledger v1 completed with zero unclassified rows.
|
||||
- [ ] Handoff packet published for S01-S03.
|
||||
|
||||
## Execution log
|
||||
|
||||
| Date (UTC) | Update | Owner |
|
||||
| --- | --- | --- |
|
||||
| 2026-02-18 | S00 package drafted in v2-rewire directory for transfer into implplan sprint workflow. | Project Manager |
|
||||
|
||||
## Decisions and risks
|
||||
|
||||
- Risk: unresolved nav rendering decisions can cause parallel implementation divergence; mitigate via mandatory S00-T02 freeze before S01 merge windows.
|
||||
- Risk: trust ownership transition can break existing deep links; mitigate with explicit alias policy and deprecation calendar.
|
||||
- Risk: missing backend contracts may be underestimated; mitigate by requiring v1 ledger coverage before implementation sprint kickoff.
|
||||
- Risk: Advisory Sources boundary ambiguity can duplicate logic across Security, Integrations, and Ops; mitigate via field-level ownership matrix.
|
||||
|
||||
## Next checkpoints
|
||||
|
||||
- Checkpoint 1: S00-T01 and S00-T02 draft completion review.
|
||||
- Checkpoint 2: S00-T03 and S00-T04 policy review and sign-off.
|
||||
- Checkpoint 3: S00-T05 ledger review with module leads.
|
||||
- Checkpoint 4: S00-T06 handoff publication and S01-S03 planning launch.
|
||||
|
||||
## Artifacts to produce in this directory
|
||||
|
||||
- `S00_advisory_sources_spec.md`
|
||||
- `S00_nav_rendering_policy.md`
|
||||
- `S00_trust_ownership_transition.md`
|
||||
- `S00_route_deprecation_map.md`
|
||||
- `S00_endpoint_contract_ledger_v1.md`
|
||||
- `S00_handoff_packet.md`
|
||||
Reference in New Issue
Block a user