feat: Add guild charters and task boards for various components
Some checks failed
Docs CI / lint-and-preview (push) Has been cancelled

- Introduced guild charters for Scanner Deno, PHP, Ruby, Native, WebService, Java, Surface.Env, Surface.FS, Surface.Secrets, Surface.Validation, UI, Zastava Observer, Zastava Webhook, Zastava Core, and Plugin Platform.
- Each charter outlines the mission, scope, required reading, and working agreements for the respective guilds.
- Created task boards for Surface.Env, Surface.FS, Surface.Secrets, Surface.Validation, and Zastava components to track progress and dependencies.
- Ensured all documents emphasize determinism, offline readiness, security, and integration with shared Surface libraries.
This commit is contained in:
2025-11-01 02:21:46 +02:00
parent e5629454cf
commit 66cb6c4b8a
227 changed files with 9913 additions and 6210 deletions

View File

@@ -1,38 +1,49 @@
# AGENTS
## Role
Implement the CERT/CC (Carnegie Mellon CERT Coordination Center) advisory connector so Concelier can ingest US CERT coordination bulletins.
## Scope
- Identify CERT/CC advisory publication format (VU#, blog, RSS, JSON) and define fetch cadence/windowing.
- Implement fetch, parse, and mapping jobs with cursor persistence and dedupe.
- Normalise advisory content (summary, impacted vendors, products, recommended mitigations, CVEs).
- Produce canonical `Advisory` objects including aliases, references, affected packages, and range primitive metadata.
- Supply fixtures and deterministic regression tests.
## Participants
- `Source.Common` (HTTP/fetch utilities, DTO storage).
- `Storage.Mongo` (raw/document/DTO/advisory stores and state).
- `Concelier.Models` (canonical structures).
- `Concelier.Testing` (integration tests and snapshots).
## Interfaces & Contracts
- Job kinds: `certcc:fetch`, `certcc:parse`, `certcc:map`.
- Persist upstream caching metadata (ETag/Last-Modified) when available.
- Aliases should capture CERT/CC VU IDs and referenced CVEs.
## In/Out of scope
In scope:
- End-to-end connector with range primitive instrumentation and telemetry.
Out of scope:
- ICS-CERT alerts (handled by dedicated connector) or blog posts unrelated to advisories.
## Observability & Security Expectations
- Log fetch and mapping statistics; surface failures with backoff.
- Sanitise HTML sources before persistence.
- Respect upstream throttling via retry/backoff.
## Tests
- Add `StellaOps.Concelier.Connector.CertCc.Tests` to cover fetch/parse/map with canned fixtures.
- Snapshot canonical advisories and support UPDATE flag for regeneration.
- Ensure deterministic ordering and timestamp normalisation.
# AGENTS
## Role
Implement the CERT/CC (Carnegie Mellon CERT Coordination Center) advisory connector so Concelier can ingest US CERT coordination bulletins.
## Scope
- Identify CERT/CC advisory publication format (VU#, blog, RSS, JSON) and define fetch cadence/windowing.
- Implement fetch, parse, and mapping jobs with cursor persistence and dedupe.
- Normalise advisory content (summary, impacted vendors, products, recommended mitigations, CVEs).
- Produce canonical `Advisory` objects including aliases, references, affected packages, and range primitive metadata.
- Supply fixtures and deterministic regression tests.
## Participants
- `Source.Common` (HTTP/fetch utilities, DTO storage).
- `Storage.Mongo` (raw/document/DTO/advisory stores and state).
- `Concelier.Models` (canonical structures).
- `Concelier.Testing` (integration tests and snapshots).
## Interfaces & Contracts
- Job kinds: `certcc:fetch`, `certcc:parse`, `certcc:map`.
- Persist upstream caching metadata (ETag/Last-Modified) when available.
- Aliases should capture CERT/CC VU IDs and referenced CVEs.
## In/Out of scope
In scope:
- End-to-end connector with range primitive instrumentation and telemetry.
Out of scope:
- ICS-CERT alerts (handled by dedicated connector) or blog posts unrelated to advisories.
## Observability & Security Expectations
- Log fetch and mapping statistics; surface failures with backoff.
- Sanitise HTML sources before persistence.
- Respect upstream throttling via retry/backoff.
## Tests
- Add `StellaOps.Concelier.Connector.CertCc.Tests` to cover fetch/parse/map with canned fixtures.
- Snapshot canonical advisories and support UPDATE flag for regeneration.
- Ensure deterministic ordering and timestamp normalisation.
## Required Reading
- `docs/modules/concelier/architecture.md`
- `docs/modules/platform/architecture-overview.md`
## Working Agreement
- 1. Update task status to `DOING`/`DONE` in both `docs/implplan/SPRINTS.md` and the local `TASKS.md` when you start or finish work.
- 2. Review this charter and the Required Reading documents before coding; confirm prerequisites are met.
- 3. Keep changes deterministic (stable ordering, timestamps, hashes) and align with offline/air-gap expectations.
- 4. Coordinate doc updates, tests, and cross-guild communication whenever contracts or workflows change.
- 5. Revert to `TODO` if you pause the task without shipping changes; leave notes in commit/PR descriptions for context.