up
Some checks failed
Build Test Deploy / docs (push) Has been cancelled
Build Test Deploy / deploy (push) Has been cancelled
Build Test Deploy / build-test (push) Has been cancelled
Build Test Deploy / authority-container (push) Has been cancelled
Docs CI / lint-and-preview (push) Has been cancelled

This commit is contained in:
2025-10-12 20:37:18 +03:00
parent b97fc7685a
commit 607e72e2a1
306 changed files with 21409 additions and 4449 deletions

View File

@@ -0,0 +1,49 @@
# Normalized Versions Rollout Dashboard (Sprint 2 Feedser)
_Status date: 2025-10-12 17:05 UTC_
This dashboard tracks connector readiness for emitting `AffectedPackage.NormalizedVersions` arrays and highlights upcoming coordination checkpoints. Use it alongside:
- [`src/StellaOps.Feedser.Merge/RANGE_PRIMITIVES_COORDINATION.md`](../../src/StellaOps.Feedser.Merge/RANGE_PRIMITIVES_COORDINATION.md) for detailed guidance and timelines.
- [Feedser SemVer Merge Playbook](merge_semver_playbook.md) §8 for persisted Mongo document shapes.
- [Normalized Versions Query Guide](mongo_indices.md) for index/query validation steps.
## Key milestones
- **2025-10-13** Normalization to finalize `SemVerRangeRuleBuilder` API contract for review.
- **2025-10-17** Connector owners to post fixture PRs showing `NormalizedVersions` arrays (even if feature-flagged).
- **2025-10-18** Merge cross-connector review to validate consistent field usage before enabling union logic.
## Connector readiness matrix
| Connector | Owner team | Normalized versions status | Last update | Next action / link |
|-----------|------------|---------------------------|-------------|--------------------|
| Acsc | BE-Conn-ACSC | ❌ Not started mapper pending | 2025-10-11 | Design DTOs + mapper with normalized rule array; see `src/StellaOps.Feedser.Source.Acsc/TASKS.md`. |
| Cccs | BE-Conn-CCCS | ❌ Not started mapper pending | 2025-10-11 | Add normalized SemVer array in canonical mapper; coordinate fixtures per `TASKS.md`. |
| CertBund | BE-Conn-CERTBUND | ❌ Not started mapper pending | 2025-10-11 | Capture firmware-style ranges; emit normalized payload; `src/StellaOps.Feedser.Source.CertBund/TASKS.md`. |
| CertCc | BE-Conn-CERTCC | ⚠️ In progress fetch pipeline DOING | 2025-10-11 | Implement VINCE mapper with SemVer/NEVRA rules; unblock snapshot regeneration; `src/StellaOps.Feedser.Source.CertCc/TASKS.md`. |
| Kev | BE-Conn-KEV | ✅ Normalized catalog/due-date rules verified | 2025-10-12 | Fixtures reconfirmed via `dotnet test src/StellaOps.Feedser.Source.Kev.Tests`; `src/StellaOps.Feedser.Source.Kev/TASKS.md`. |
| Cve | BE-Conn-CVE | ✅ Normalized SemVer rules verified | 2025-10-12 | Snapshot parity green (`dotnet test src/StellaOps.Feedser.Source.Cve.Tests`); `src/StellaOps.Feedser.Source.Cve/TASKS.md`. |
| Ghsa | BE-Conn-GHSA | ⚠️ DOING normalized rollout task active | 2025-10-11 18:45 UTC | Wire `SemVerRangeRuleBuilder` + refresh fixtures; `src/StellaOps.Feedser.Source.Ghsa/TASKS.md`. |
| Osv | BE-Conn-OSV | ✅ SemVer mapper & parity fixtures verified | 2025-10-12 | GHSA parity regression passing (`dotnet test src/StellaOps.Feedser.Source.Osv.Tests`); `src/StellaOps.Feedser.Source.Osv/TASKS.md`. |
| Ics.Cisa | BE-Conn-ICS-CISA | ❌ Not started mapper TODO | 2025-10-11 | Plan SemVer/firmware scheme selection; `src/StellaOps.Feedser.Source.Ics.Cisa/TASKS.md`. |
| Kisa | BE-Conn-KISA | ❌ Not started mapper TODO | 2025-10-11 | Localisation-aware mapper with normalized rules; `src/StellaOps.Feedser.Source.Kisa/TASKS.md`. |
| Ru.Bdu | BE-Conn-BDU | ❌ Not started mapper TODO | 2025-10-11 | Emit normalized ranges, capture provenance; `src/StellaOps.Feedser.Source.Ru.Bdu/TASKS.md`. |
| Ru.Nkcki | BE-Conn-Nkcki | ❌ Not started mapper TODO | 2025-10-11 | Similar to BDU; ensure Cyrillic provenance preserved; `src/StellaOps.Feedser.Source.Ru.Nkcki/TASKS.md`. |
| Vndr.Apple | BE-Conn-Apple | ✅ Shipped emitting normalized arrays | 2025-10-11 | Continue fixture/tooling work; `src/StellaOps.Feedser.Source.Vndr.Apple/TASKS.md`. |
| Vndr.Cisco | BE-Conn-Cisco | ❌ Not started mapper TODO | 2025-10-11 | Decide on scheme (`semver` vs custom) before emitting rules; `src/StellaOps.Feedser.Source.Vndr.Cisco/TASKS.md`. |
| Vndr.Msrc | BE-Conn-MSRC | ❌ Not started mapper TODO | 2025-10-11 | Gather samples, define scheme, emit normalized rules; `src/StellaOps.Feedser.Source.Vndr.Msrc/TASKS.md`. |
| Nvd | BE-Conn-NVD | ⚠️ Needs follow-up mapper complete but normalized array MR pending | 2025-10-11 | Align CVE notes + normalized payload flag; `src/StellaOps.Feedser.Source.Nvd/TASKS.md`. |
Legend: ✅ complete, ⚠️ in progress/partial, ❌ not started.
## Monitoring
- Merge now emits `feedser.merge.normalized_rules` (tags: `package_type`, `scheme`) and `feedser.merge.normalized_rules_missing` (tags: `package_type`). Track these counters to confirm normalized arrays land as connectors roll out.
- Expect `normalized_rules_missing` to trend toward zero as each connector flips on normalized output. Investigate any sustained counts by checking the corresponding module `TASKS.md`.
## How to use this dashboard
1. Before opening a connector PR, update the module `TASKS.md` entry and drop a short bullet here (status + timestamp).
2. When a connector lands normalized outputs, flip the status to ✅ and note any rollout toggles (feature flags, fixture regenerations).
3. If a dependency or blocker emerges, add it both in the module `TASKS.md` and in this matrix so merge/storage can escalate quickly.