ui progressing

This commit is contained in:
master
2026-02-20 23:32:20 +02:00
parent ca5e7888d6
commit 1ec797d5e8
191 changed files with 32771 additions and 6504 deletions

View File

@@ -1,7 +1,7 @@
# UI v2 Rewire (Canonical Planning Set)
This directory contains two things:
- Raw iterative design packs (`pack-01.md` ... `pack-21.md`)
- Raw iterative design packs (`pack-01.md` ... `pack-22.md`)
- Cleansed planning inputs for sprint decomposition
Use these files as the planning entrypoint:
@@ -14,6 +14,7 @@ S00 package files:
- `S00_sprint_spec_package.md` - detailed S00 sprint spec with acceptance criteria
- `S00_contract_ledger_template.md` - reusable endpoint contract ledger template
- `S00_endpoint_contract_ledger_v1.md` - starter ledger sheet for immediate use
- `S00_endpoint_contract_ledger_v2_pack22.md` - Pack 22 contract delta and backend dependency baseline
## Precedence policy
@@ -24,7 +25,7 @@ A higher pack that does not define a screen in detail does not erase the latest
## Raw materials
Raw packs are preserved as historical input and should not be used directly as the source of truth for sprint planning:
- `pack-01.md` ... `pack-21.md`
- `pack-01.md` ... `pack-22.md`
- `prompt.txt`
## Planning rule