Resolve Concelier/Excititor merge conflicts

This commit is contained in:
root
2025-10-20 14:19:25 +03:00
2687 changed files with 212646 additions and 85913 deletions

View File

@@ -0,0 +1,52 @@
# Authority Plug-in Scoped Service Coordination
> Created: 2025-10-19 — Plugin Platform Guild & Authority Core
> Status: Scheduled (session confirmed for 2025-10-20 15:0016:00UTC)
This document tracks preparation, agenda, and outcomes for the scoped-service workshop required before implementing PLUGIN-DI-08-002.
## Objectives
- Inventory Authority plug-in surfaces that need scoped service lifetimes.
- Confirm session/scope handling for identity-provider registrars and background jobs.
- Assign follow-up tasks/actions with owners and due dates.
## Scheduling Snapshot
- **Meeting time:** 2025-10-20 15:0016:00UTC (10:0011:00 CDT / 08:0009:00 PDT).
- **Facilitator:** Plugin Platform Guild — Alicia Rivera.
- **Attendees (confirmed):** Authority Core — Jasmin Patel; Authority Security Guild — Mohan Singh; Plugin Platform — Alicia Rivera, Leah Chen.
- **Optional invitees:** DevOps liaison — Sofia Ortega (accepted).
- **Logistics:** Invites sent via shared calendar on 2025-10-19 15:30UTC with Teams bridge + offline dial-in. Meeting notes will be captured here.
- **Preparation deadline:** 2025-10-20 12:00UTC — complete checklist below.
## Pre-work Checklist
- Review `ServiceBindingAttribute` contract introduced by PLUGIN-DI-08-001.
- Collect existing Authority plug-in registration code paths to evaluate.
- Audit background jobs that assume singleton lifetimes.
- Identify plug-in health checks/telemetry surfaces impacted by scoped lifetimes.
### Pre-work References
- _Add links, file paths, or notes here prior to the session._
## Draft Agenda
1. Context recap (5 min) — why scoped DI is needed; summary of PLUGIN-DI-08-001 changes.
2. Authority plug-in surfaces (15 min) — registrars, background services, telemetry.
3. Session handling strategy (10 min) — scope creation semantics, cancellation propagation.
4. Action items & owners (10 min) — capture code/docs/test tasks with due dates.
5. Risks & follow-ups (5 min) — dependencies, rollout sequencing.
## Notes
- _Pending coordination session; populate afterwards._
## Action Item Log
| Item | Owner | Due | Status | Notes |
|------|-------|-----|--------|-------|
| Confirm meeting time | Alicia Rivera | 2025-10-19 15:30UTC | DONE | Calendar invite sent; all required attendees accepted |
| Compile Authority plug-in DI entry points | Jasmin Patel | 2025-10-20 | IN PROGRESS | Gather current Authority plug-in registrars, background jobs, and helper factories that assume singleton lifetimes; add the list with file paths to **Pre-work References** in this document before 2025-10-20 12:00UTC. |
| Outline scoped-session pattern for background jobs | Leah Chen | Post-session | BLOCKED | Requires meeting outcomes |